Project Profile

Why 50+ Schools Choose the Mercury 1.8m Flat Top Panel
Overview: The Edgesmith Mercury 1.8m Flat Top aluminium panel has been widely adopted as the benchmark fencing solution for New Zealand schools. With installations across Auckland and beyond, th...
Read moreSecuring a High-End Residential Development in Auckland's North Shore
Client: Residential Developer / Fencing ContractorLocation: Silverdale, AucklandProducts Used: Locinox gate hardware, swing gate automation, powder-coated fence panels A fencing contractor was enga...
Read moreCommercial Perimeter Upgrade for a South Auckland Industrial Facility
Client: Facilities Manager, Manufacturing SectorLocation: Wiri, AucklandProducts Used: 358 Double Vertical Anti-Scale Mesh fencing, heavy-duty cantilever gate hardware, post hardware and fasteners ...
Read moreArchitectural Driveway Gate for a Luxury Home Build
Client: Custom Home Builder / FabricatorLocation: Havelock North, Hawke's BayProducts Used: Custom laser-cut gate infill panels, Locinox locks and hinges, Roger Technology gate automation A bespoke...
Read morePacific Islands Supply — Streamlined Procurement for a Resort Development in Fiji
Client: Project Manager, Hospitality SectorLocation: Coral Coast, FijiProducts Used: Stainless steel fittings, gate hardware, fencing components A resort expansion project in Fiji required a reliab...
Read more
Project Name: Ruakura Super Hub Location: Hamilton, New Zealand Scale and Significance: This substantial project highlighted Paul Nathan Fencing’s expertise and provided an exciting opportuni...
Read moreLATEST POSTS
Edgesmith is featured in some of the world’s most prestigious publications.
See what the world is saying about the products we create.

Native Backup: Why Roger on Solar Just Works
How Roger’s low-voltage DC-bus architecture makes battery operation the controller’s default state rather than a bolted-on fallback — and what that means for cycle counts, solar specification and s...
Read more
The Service Interval That Disappeared: What Roger Engineered Out of the System
Technical Series · Part 06 · Lifetime Economics Explained The Service Interval That Disappeared.What Roger Engineered Out of the System. A component-by-component breakdown of what conventionally...
Read more
One Cable, Three Wires: How Sensorless Feedback Eliminates the Encoder Cable
Technical Series · Part 05 · Feedback Architecture Explained One Cable, Three Wires.Sensorless Feedback in the Pit. Why a Roger sensorless brushless operator runs on three wires that carry both ...
Read more